Wall stability bar
It is a telescopic bar to fix the mezzanine against the wall, when the structure is separated from the wall.
Reference: 83010-N
Wall fixations are used to ensure the lateral stability of the mezzanine floor. If wall fixing is not possible, additional bracing elements must be used.
These are attached to the mezzanine beams and to the wall by means of suitable anchors, depending on the wall material.
Only when total amount exceeds 1000€ (TAX excl.).
Credit card, bank transfer, PayPal, check...
Check the payment and financing facilities that we offer you
Our technical department will resolve your doubts from Monday to Friday from 7:00 to 15:00h.
Dispatched in 5 days. Check our delivery times in real time here.
Learn all the benefits of this water-resistant treatment.
All mezzanine kits include the necessary fixings, although additional units can be purchased for reinforcement.
They should never be used to replace the columns, as they are not designed to transmit the vertical load of the mezzanine, only to prevent from any lateral movement or swinging of the structure.
For more information contact our Technical Department.
The products can be located indoors and outdoors taking into account some recommendations.
The material will be delivered at street level (curbside delivery) by an external transport company.
Tecro Space S.L. is not responsible of the use or inadequate installation of the product.
Our technical team can facilitate you the task. Send us a sketch with your idea and we will develop 2d or 3d plans in order to see how it will be. Click here to contact us.
We do not currently offer an on-site measurement service. However, we recommend you explore the Mr Assembler website, where you can find assemblers who do offer this service. In addition, their platform allows you to hire an assembly service for the products you need.
You can make aesthetic modifications, but any structural modification non approved by Tecrostar will be under customer’s responsibility.
You can find an fitter near you on misterassembler.com. This website puts fitters and customers in contact, so the price and the responsibility of the installation is the fitter's. This website is not associated with Tecrostar.
Tecrostar can provide you with an estimate of the cost of assembly that depends largely on the distance between the assembly team and the installation site and the type of service hired (prior visit and measuring, delivery service and transport of goods to the site).
In any case, this estimate must be agreed between the client and the fitter.
The mezzanine floors are packed and shipped by an external agency in a lorry provided with a lifting platform, so that the boxes can be unloaded on the ground. The order will be delivered at street level to the address specified by the customer.
If there are access restrictions, there could be additional costs due to the necessity of transferring the merchandise to a smaller vehicle.
In order to deliver mezzanines XL, the delivery location should be accessible to a truck/long trailer (maximum mass admitted up to 36t). Should you think there is any kind of restriction, please contact us. The customer should take care of the merchandise unloading process. That unloading should be made from the lateral sides of the truck (this kind of truck does not have a back liftgate). We deliver the product packed with pallets at the bottom, so its unloading should be made preferably with a forklift.
At Tecrostar, we offer four types of boxes that are carefully designed to adapt to and protect the products. Depending on the products in your order, you will receive one or the other.
Mezzanine floors in the S, M and L range are shipped in the same type of box. The S and M mezzanines require one crate for each shipment. The L range, however, normally requires two crates.
The XL mezzanines are shipped in two boxes; one for the wooden elements and one for the steel elements.
The rest of the products (stairs, handrails and other items) are shipped in smaller boxes.
Box for S, M and L
2390
1125
550
Wooden XL Box
3050
1205
710
Iron XL Box
2450
990
735
Small items Box
2350
320
230
*All mezzanine crates are shipped palletised.
Our logistics department packs the products with great care to optimise the space available inside the boxes. Sometimes, smaller products may share a box with mezzanines. In this way we make the most of the space and ensure that everything fits correctly.
Don't be alarmed by the total weight of the product, the components are light and manageable, so you can move them easily and take them up in the lift.The heaviest components are the primary beams from the L Range (39 kg), the rest of the ranges are considerably lighter (12kg).The floor panels are very light and fit in any lift. No component is more than 2.4m long and therefore, fits in most lifts.
However, it is important to mention that in the case of the XL range, some components may be a little heavier.
Sometimes, the carrier cannot access to point of delivery due to an extremely narrow street or any other difficulty. In such cases, the carrier cannot do the delivery with the usual truck and he may need to use a different vehicle or extra support.
If the carrier considers that the point of delivery is complicated, request a quotation. If you don’t inform in advance that the access is complicated, the delivery will be paralysed until you pay the extra cost.
Since 1999, our track record speaks for itself: quality, guarantee and commitment to you and our community. Before getting into your hands, each of our products undergoes rigorous testing to ensure it meets the highest standards. In addition, we carefully choose the best materials to assure durability.
We are so confident in the quality of our products and materials that many of them have extended warranty periods.
Below is detailed information about our warranties, the service life of our products and the different environmental conditions that can affect the materials.
It is a telescopic bar to fix the mezzanine against the wall, when the structure is separated from the wall.
It is a telescopic bar to fix the mezzanine against the wall, when the structure is separated from the wall.